Skip to content

Performance contracting · As a service

Get paid for the water you deliver.

Independent verification for performance-based water contracts. One protocol both sides sign, timestamped facts, and an attestation that triggers payment per cubic metre, in any country.

A water meter on its main, its reading linked to an invoice paid per cubic metre

02In short

What a performance contract is.

A contract where the client pays per cubic metre actually delivered or saved. Veracity is the independent third party that verifies the volumes both sides are paid on.The client pays per verified cubic metre; Veracity attests the volumes.

  1. For watertech providers selling outcomes as a service.
  2. For utilities and industrials who pay for results.
  3. Veracity attests the facts; the contract sets the price.
Each month's delivered cubic metres, with the payment following them

03The baseline

A starting point each side counts its own way.

Before work starts, each side sets its own baseline, and payment gets negotiated instead of triggered. Our standardised method sets one starting point, aligned with the IWA water balance and performance indicators and with internationally recognised measurement methods. Both parties rely on it.One starting point, aligned with the IWA, that both parties rely on.

  1. IWA water balance: system input, authorised consumption, apparent and real losses.
  2. Adjustments agreed in advance: season, pressure, new connections.
  3. One reading of the volumes, shared by both parties.
The IWA water balance: system input split into authorised consumption and losses, real losses highlighted

04One rulebook

Three things, agreed before work starts.

  1. 01The baseline The starting point above, signed by both parties.
  2. 02The client's obligations Each one dated, with a written consequence if missed.
  3. 03The data Access to meters and work orders, written into the contract.
The contract and its three clauses signed before work: the baseline, the client's dated duties, access to data

05Who does what

We attest the facts. Your contract sets the price.

  1. 01ProviderDelivers and reports.
  2. 02ClientOperates, repairs, gives access.
  3. 03VeracityTimestamps and verifies the facts.
  4. 04ContractTurns verified volumes into payment.

06Project types

Works wherever a cubic metre can be measured.

Verified volumes can later become certificates or attract corporate co-funding, claimed once.

  • Leak reduction
  • Industrial reuse
  • Rainwater
  • Aquifer recharge
  • Irrigation
  • Atmospheric water
  • Treatment-plant optimisation

07Get started

Turn CAPEX into OPEX without arguing over the numbers.

+Questions

Does Veracity decide the payment?

No. Veracity attests the facts. The contract sets the price and the consequences.

What if the client delays a repair?

The contract sets a repair deadline per category. Veracity timestamps the notice, so the deadline is undisputed.

Which projects does it work for?

Any intervention where a cubic metre can be measured: leaks, industrial reuse, rainwater, recharge, irrigation, atmospheric water, treatment plants.

Can verified volumes become certificates?

Yes. The same volumes can later be certified or attract corporate co-funding, as long as each one is claimed once.

Who pays for verification?

A baseline set-up, then a flat fee per periodic attestation. The cost can be shared or built into the contract.