Skip to content

Protocols

One method per intervention.

A protocol says exactly how a type of project is measured, verified and certified. Public, versioned, and reviewed by independent experts.

Six protocol sheets standing in a row on the NEXUS Standard, laid out the same way, each with its own picto; the two in public consultation in blue

02In short

What a protocol is for.

To speed up the adoption of climate and environmental solutions, the market created an incentive: the certificate. Its value rests on the protocol behind it, the accounting standard for the impact.A certificate is worth only the protocol behind it: the accounting standard for the impact.

  1. A protocol fixes what is measured, how, and the evidence required.
  2. Without a robust protocol, no credible certificate.
  3. Without a credible certificate, no easy access to the market.

03A key to the market

Voluntary standards open the market.

A recognised method makes your impact comparable and verifiable. Buyers, funders and regulators then speak your language: protocols become a key to the market.A recognised method makes your impact comparable, verifiable and fundable.

  1. Project developers and ecotechs. Proof that holds up, to sell, raise funds or answer a tender.
  2. Companies. Comparable volumes, ready for their water strategy and reporting.
  3. Funders. A verified impact, easier for sustainable finance to fund.
A ruled sheet as the bow of a key, its bit in blue: the protocol opens the market

05Methodological alignment

Credible by design.

Built on the references auditors, regulators and funders already use. Nothing that matters is self-declared.

  • Water accounting
    • VWBA 2.0
    • ISO 14046
  • Measurement & verification
    • IPMVP
    • ISO 14064-2
    • ISO 14064-3
  • Evidence & traceability
    • ISO 22095
    • ISO/IEC 15459
  • Independent verification
    • ISO/IEC 17029
    • ISO 14065

Data reusable in:CSRD · ESRS E3 · CDP Water Security · SBTN Freshwater · AWS Standard v3.0 · GRI 303 · CEO Water Mandate

06Structure

Same structure, every time.

Every protocol follows the same six steps, in the same order: a buyer, a funder or a verifier always knows where to look.

  1. 01Eligibility
  2. 02Baseline method
  3. 03Measurement plan
  4. 04Calculation
  5. 05Verification requirements
  6. 06Evidence level

07How a protocol is made

Reviewed before it is published.

  1. 01Drafted by Veracity's normative team.
  2. 02Reviewed by domain experts before publication and at every revision.
  3. 03Opened to public consultation for integrity changes.
  4. 04Versioned: a certificate always names the version it used.
A protocol sheet inside a loop of two arrows, with a blue seal: reviewed before publication and at every revision

08Get started

Your project type is not listed?

Founding pilots shape new protocols. Tell us what you measure.

+Questions

Which projects qualify?

Measurable projects that go beyond business as usual and legal duty. Each protocol sets its own eligibility rules.

What if my project type is not listed?

Become a founding pilot. Founding pilots shape new protocols with us.

Who writes the protocols?

Veracity's normative team drafts them; domain experts review them before publication and at every revision.

What happens when a protocol changes?

A new version is published. Each certificate names the version it used, so past results stay valid and traceable.

What does “Public consultation” mean?

The draft protocol is open for public comment before it is published. Protocols dated Q1 2027 or Q3 2027 are being finalised with founding pilots until then.